The Challenge was set for the site in Warringah Mall. Vive needed the Pilates Studio opened by Christmas. It was September 25th. Job done and dusted by December 18th.
Linked went on to deliver Vive’s site in Double Bay with much the same timeframe.
That’s what we do. That’s what we love!
Vive Active, Warringah Mall
Design Management, Authority Approvals, Contract Development, Contractor Selection, Superintendent, Tenancy Coordination.
Linked - Craig Emerton Siren Design, Evolve Constructions
Construct Only