21 May 2020
In
By
EG Solutions
Working with the ACU health science department, Linked worked closely with Buildcorp to deliver a key learning area to provide students access to sophisticated equipment, simulating a hospital setting.
The building was a purpose built facility for ACU to inspire teaching and training in health science
22 December 2025
In
By
linkedpm
Linked partnered with Virtus Health to manage the construction of a Class ISO 7 clean room, purpose-built to maintain strict contamination control throughout all stages of life science and stem cell processes within the fertility clinic.
The project required precise coordination and specialised construction techniques to
22 December 2025
In
By
linkedpm
3Virtus Health’s established clinics at Greenwich and Parramatta were identified for upgrades to deliver an enhanced suite of services supporting family planning outcomes.
Linked collaborated closely with Virtus Health to engage specialist consultants and medical professionals, overseeing the construction of advanced, sterile laboratory environments across both
22 December 2025
In
By
linkedpm
Linked facilitated the new construction of The North Shore Specialist Day Hospital (NSSDH) - a leading day hospital facility comprising of treatment rooms, two operating theatres and associated recovery areas. The clinic offers multiple procedures including fertility, endoscopy, colonoscopy and Ear, Nose Throat surgeries.
The brief
31 March 2022
In
By
linkedpm
It was a pleasure to be involved with Chris Koumi and navigate the landscape for the development of this childcare centre in Waverley.
This childcare development was constructed on a tight site with basement carpark, car stackers and three levels boundary to boundary. Notwithstanding the challenges
18 February 2025
In
By
linkedpm
The Manor House - Under ConstructionÂ
Linked is engaged to assist with the authority approvals, finalisation of contractor selection and construction delivery (including renovation) of the existing heritage premises on Darling Street, Balmain (a former restaurant site).
With the head contractor terminated following substantial commencement including demolition,
31 March 2022
In
By
linkedpm
G8 integrated with Hargreaves Property Group in the early development planning phase to create a purpose-built centre. As you open the door to the centre, you are immersed in a world where children are encouraged to explore and learn. The spacious outdoor play area includes
21 May 2021
In
By
EG Solutions
Improving circulation, class function and access to Liggins Quadrangle was paramount. This was a design and construct project which involved alterations and additions to a number of buildings.
The works included a new, three storey walkway connecting five separate buildings along with providing an extensive glass